The 5th IEA SHC Task 57 Expert's Meeting will be held in Madrid Spain on March 8. There will be some related meetings taking place in the same location:
-
CEN TC 312 WG1
March 6, 2018 - 09:00 - 12:00
-
Solar Keymark Network
March 6, 2018 - 13:00 - 19:00 & March 7, 09:00 - 14:00
-
Global Solar Certification Network, GSCN
March 7, 2018 - 15:00 - 18:00
Venue
AENOR
Calle de Génova, 6
28004 Madrid, Spain
Phone: +34 915 294 900
Map
Agenda
09:00: Welcome by the task operating agent and the host – and short presentation of participants
General intro to Task 57 / Jan Erik Nielsen (JE)
-
Structure
-
Subtask A: Support to Global Solar Certification Network
-
Subtask B: Support to ISO TC 180 (ISO Technical Committee for Solar Energy)
-
Subtask C: Promotion and capacity building with respect to ISO standards and certification schemes
Subtask A. Kick-off the Global Solar Certification Network (GSCN) / Harald Drück (HD)
-
Resumé of plenary GSCN plenary meeting March 7
-
Member status
-
Board members
-
QAC members
-
Economy
-
Proposed plans for promoting GSCN and getting more members
-
Next GSCN plenary meeting
-
Changes in working rules ? Please send any proposals to Harald Drück at latest until February 16th, (Email: drueck@itw.uni-stuttgart.de)
-
Subtask A dissemination activities 2017
-
Website (IEA SHC and GSCN web sites)
-
SHC/ISES 2017 Conference – Keynote /JE – Paper /HD
-
Australian Pacific Solar Research Conference – Paper /JE
Updates at Solar Keymark Network, CEN TC 312 and ISO TC 180 meetings
-
Subtask A dissemination – proposed activities 2018
-
Assistance to manufacturers to “globalize” their certifications (have products certified in new countries). Manufacturers with interest should contact Harald Drück (Email: drueck@itw.uni-stuttgart.de) a.s.a.p.
-
Discussion of work plan – revision ? (including definitions of deliverables and distribution of responsibilities) for subtask A
-
Make specific list of actions to be done before next Task 57 meeting
-
Status of participants in subtask A / HD
-
Check table for subtask A in annex below this agenda
-
Perspectives for GSCN (support by new follow-up IEA task necessary?)
-
Any other businesso …
Subtask B. Improvements of test procedures – support and input to ISO / He Zinian (HZ)
-
Present status of Subtask B: Improvements of test procedures – support and input to ISO/ HZ
-
B1: Accelerated ageing test of collectors
-
Status for SpeedColl2 Project /Stephan Fischer
-
Status for draft proposal ISO document(s) based on test methods from SpeedColl1 & 2/Stephan Fischer
-
Status for co-operation on test methods for accelerated ageing testing of flat plate collectors and evacuated tubular collectors / Li & Korbinian
-
B2: Mechanical load testing of collectors and supporting structures
-
3rd draft: Test methods for mechanical load on support of close-coupled solar water heating systems / Shen Bin (References to EUROCODES and ASCE document to checked)
-
B3: Building envelope integrated collectors and systems
-
3rd draft: Test methods and requirements for building integrated collectors and systems/Zhang Lei or Gu Xiuzhi (Connect to Task 56 subtask B, Christoph Maurer (OA Federizzi Roberto) – standards for solar building components (B3))
-
B4: Draft proposals for new test procedures
-
3rd draft: Test methods for close-coupled solar water heating systems reliability and safety / He Zinian (References to EUROCODES and ASCE document to checked)
-
B5: Defining/discussing extreme conditions
-
Status for “short report” on what’s going on in ”IEC/TC 82, IEA/ PVPS” group on “extreme conditions” / HZ
-
B6: New proposal for ISO standard on “check of collector field performance” / JEN
-
Status for processing in CEN and ISO. 2nd draft: Discussion/revision
-
Any up-coming projects of active participants which can contribute to the subtask B and ISO 180?
-
Use of Ray-tracing / Julian Hertel (UIB)
-
Report of dissemination activities 2017
-
Paper(s) on Speedcoll1
-
Report to ISO TC 180
-
Proposals for dissemination activities 2018
-
Prepare list for actions until next meeting
-
Status of active participants in subtask B / HZ
-
Check table for subtask B in annex below this agenda
-
Perspectives for ISO activities (support by new follow-up task necessary?)
-
Any other business
-
China (He Tao) now Chair of ISO TC180/SC4 Systems – Thermal performance, reliability and durability…
-
Next ISO TC 180 meeting 13-14 September 2018, SPF, CH (connected to Eurosun)o
Subtask C. Promotion and capacity building with respect to ISO standards and state-of-the-art certification schemes / Ashraf Kraidy
-
List of ongoing/coming projects of active participants which can contribute to the subtask C
-
SHAMCI / Ashraf Kraidy
-
Others ?
-
Report of actions:
-
Status for survey/questionnaire/promotion on ISO 9806 / Ashraf, Ken
-
Guideline on ISO 9806 - publication / Korbinian Kramer
-
Status of “model certification schemes” – 2nd draft to be presented/ Jan Erik Nielsen
-
Status of promotion activities (workshops and conferences attended)
-
Make action list until next meeting
-
Perspectives for ISO activities (support by new follow-up task necessary?)
-
Status of active participants in subtask C
-
Check table for subtask C in annex below
-
Any other businesso …
General matters / JEN
Coming meetings and events:
-
Last Task 57 expert meeting:
-
September SPF, CH (connected to ISO & Eurosun)? OR October – November, China OR ?
-
Related meetings/conferences:
-
ISO TC 180 meeting at SPF in Rapperswil September 13-14
-
Eurosun Conference at SPF in Rapperswil September 10-13
-
Exco meeting in … November/December
Future activities related to standardisation and certification
-
Brainstorming related to activities needed
-
Organising follow up task/project
-
Identification of potential participants and partners
-
Identificaion of potential key actors (operating agent, Subtask leaders)
-
Misc:o …
18:00: End of Meeting
Common Dinner - optional